EurekaMag.com logo
+ Site Statistics
References:
52,725,316
Abstracts:
28,411,598
+ Search Articles
+ Subscribe to Site Feeds
EurekaMag Most Shared ContentMost Shared
EurekaMag PDF Full Text ContentPDF Full Text
+ PDF Full Text
Request PDF Full TextRequest PDF Full Text
+ Follow Us
Follow on FacebookFollow on Facebook
Follow on TwitterFollow on Twitter
Follow on Google+Follow on Google+
Follow on LinkedInFollow on LinkedIn

+ Translate

The use of critical path methods in the analysis and control of glasshouse construction projects


Acta Horticulturae (40): 517-530
The use of critical path methods in the analysis and control of glasshouse construction projects
The paper considers the use of critical path methods on a case study of glasshouse construction. A knowledge of the principles underlying network construction and analysis is assumed, although a problem arising when considerable, time-consuming tasks are sub-divided, is discussed. An alternative way of drawing the network to avoid the problem is suggested. The bar diagram technique of labour and job scheduling is seen to be a management tool as useful as the network itself.


Accession: 000557265



Related references

Application of critical path analysis in forestry projects. Indian Forester 100(5): 320-322 + 1 tab., 1974

Critical path analysis applied to the control of mercury inputs to uk coastal waters. Environmental Pollution Series B Chemical & Physical 2(6): 451-464, 1981

New methods of glasshouse construction tested at Alnarp. Horticultura, 8: 197-202, 1954

Glasshouse construction and environmental control. Outlook on Agriculture 8(2): 54-62, 1974

Identification of critical factors affecting flexibility in hospital construction projects. Herd 3(2): 30-47, 2011

How the critical path method can assist logging road construction. Philipp. Lumberm, 15: 11; 12, 34, 35, 37; 28-31, 1969

How the critical path method can assist logging road construction. II. 1969

Critical management practices influencing on-site waste minimization in construction projects. Waste Management 59(): 330-339, 2016

Management of rural development projects Sixth plan, CPM, critical path method, PERT, programme evaluation and review technique, network, India. Indian journal of regional science4(2): 139-147, 1982

Quality control for evaluation of effect of control over occupational hazards in construction projects. Zhonghua Lao Dong Wei Sheng Zhi Ye Bing Za Zhi 24(9): 575-576, 2006