+ Site Statistics
References:
54,258,434
Abstracts:
29,560,870
PMIDs:
28,072,757
+ Search Articles
+ PDF Full Text Service
How our service works
Request PDF Full Text
+ Follow Us
Follow on Facebook
Follow on Twitter
Follow on LinkedIn
+ Subscribe to Site Feeds
Most Shared
PDF Full Text
+ Translate
+ Recently Requested

Calculation of chips delivered by railroad



Calculation of chips delivered by railroad



Bumazhnaya Promyshlennost (6): 23-24



According to the Soviet Standard OST 13-74-79 for the gravimetric determination of chip vol., each gondola car containing chips is weighed and samples are taken for the determination of wood specific vol. and calculation of the solid vol. It is suggested that the method should be simplified by calculating specific vol. from the solid vol. stated by the supplier and the wt. of chips in a given car.

Please choose payment method:






(PDF emailed within 1 workday: $29.90)

Accession: 001311668

Download citation: RISBibTeXText


Related references

Wood chips for industrial use from railroad tie wastes. 1971

Calculating the amount of technical chips delivered for pulping. Bumazhnaya Promyshlennost' (1): 20-21, 1986

Calculation of the volume of technological chips. Bumazhnaya Promyshlennost' (12): 23-24, 1977

The calculation of the basic density of whole-tree chips. Silva Fennica 12(1): 40-46, 1978

Calculation method for pneumatic conveyors for wood chips. Holzindustrie 32(4): 99-100, 1979

Assessment of the quality of coarse chips and of chips and particle boards manufactured from coarse chips. I: Processing coarse chips in the particle-board industry, and assessment of the quality of coarse chips. II: Quality of the chips obtained from coarse chips and p. Holzindustrie. 25: 3; 4, 70-3; 101-5. 26 ref, 1972

Numerical calculation of the electroosmotic flow at the cross region in microfluidic chips. Electrophoresis 24(7-8): 1242-1252, 2003

Method of catching equipment calibration as exemplified by the quantitative calculation of mosquitoes in the area of the Baikal-Amur Railroad (Beta-Puassone Scheme). Parazitologicheskii sbornik: 1) 48-61, 1983

Cost calculation model concerning small-scale production of chips and split firewood. Tyotehoseuran Metsatiedote ( 15): 4 pp., 1995

The effect of location and facility demand on the marginal cost of delivered wood chips from energy crops: a case study of the state of Tennessee. Biomass and Bioenergy 13(3): 117-123, 1997

Calculation of the uncertainty in the dose delivered during radiation therapy. Medical Physics 12(5): 608-612, 1985

Calculation of the dose delivered to organs outside the radiation beams. Medical Physics 15(6): 879-883, 1988

Comminution of logging residues with a tub grinder: calculation of productivity and procurement cost of wood chips. Croatian Journal of Forest Engineering 27(2): 103-114, 2006

Impact of karstification and related processes on railroad construction (Berkakit-Tommot Railroad as an example). Pages 193-198 2005, 2005