Design and construction of bored large-diameter pile columns
D.A.Romanov
Soil Mechanics and Foundation Engineering 15(3): 153-156
1978
ISSN/ISBN: 0038-0741 DOI: 10.1007/bf02132789
Accession: 018702199
PDF emailed within 0-6 h: $19.90
Related References
Gong, X.B.; Fan, Q.L.; Xu, Y.J. 2011: Efficiency of Pile Groups of Large Diameter Bored Cast-in-Place Pile Advanced Materials Research 261-263: 1215-1219Sonpal, R.C.; Dave, R.N. 1980: Load test analysis on a large diameter bored pile Proceedings of the Southeast Asian Conference on Soil Engineering 6(1): 301-316
Gandhi, S.R.; Suresh, P.K.; Raju, V.S. 1988: Lateral load tests on large diameter bored pile and analysis Pages 373-377 1988
Tejchman, A.; Gwizdala, K. 1988: Comparative analysis of bearing capacity of large diameter bored pile Fetal Ther: 553-558
Zhang, L.M.; Wong, E.Y. 2007: Centrifuge Modeling of Large-Diameter Bored Pile Groups with Defects Journal of Geotechnical and Geoenvironmental Engineering 133(9): 1091-1101
Ng, C.W.W.; Zhang, L.; Nip, D.C.N. 2001: Response of Laterally Loaded Large-Diameter Bored Pile Groups Journal of Geotechnical and Geoenvironmental Engineering 127(8): 658-669
Liu Tiejun; Wang Wenhao; Huang Weizhen 1995: Construction and bearing capacity of bored cast-in-place piles using the variable diameter embossing pile technique Shanghai Dizhi = Shanghai Geology 1995(4): 6-14
Fort, D.S.; Martin, P.L. 1990: Installation, instrumentation and load testing of a large diameter bored pile in Upper Chalk Pages 351-358 1990
Li, W.; Wong, C.; Yim, K.; Leung, M. 2011: Shaft Friction between Marble and Concretein Rock-Socketted Large Diameter Bored Pile: a Review of State of Art Procedia Engineering 14: 1752-1758
Lapshin, F.K.; Potapov, S.N.; Makrushin, V.A.; Kislyakov, O.V. 1978: Experience in the design and construction of bored-pile foundations of an industrial building Soil Mechanics and Foundation Engineering 15(5): 287-290
Castelli, F. 2002: Discussion of Response of Laterally Loaded Large-Diameter Bored Pile Groups by Charles W. W. Ng, Limin Zhang, and Dora C. N. Nip Journal of Geotechnical and Geoenvironmental Engineering 128(11): 963-964
Ng, C.W.W.; Zhang, L.; Nip, D.C.N. 2002: Closure to Response of Laterally Loaded Large-Diameter Bored Pile Groups by Charles W. W. Ng, Limin Zhang, and Dora C. N. Nip Journal of Geotechnical and Geoenvironmental Engineering 128(11): 964-965
Jia, J.L.; Zhou, M.; Zheng, J.H. 2011: Experimental Study on Bearing Behavior of Large-Diameter Overlength Cast-in-Place Bored Pile Post-Grouting Advanced Materials Research 243-249: 3251-3258
Yamashita, K.; Kakurai, M.; Matsuyama, K. 1989: Settlement analysis of large-diameter bored pile groups - L'analyse des tassements de groupes de pieux forés de grand diamètre Congres International de Mecanique des Sols et des Travaux de Fondations 12: 1079-1082
Wang, Z.; Shi, F.; Dai, Z. 2020: Laterally Loading Experimental Study of Bearing Capacity Characteristics of Large-Diameter Bored Cast-in situ Deep and Long Pile Geotechnical and Geological Engineering 38(3): 3113-3124
Zhou, J.-jin; Yu, J.-lin; Gong, X.-nan; Yan, T.-long 2020: Field tests on behavior of pre-bored grouted planted pile and bored pile embedded in deep soft clay Soils and Foundations 60(2): 551-561
Raongjant, W.; Jing, M. 2013: Back-Analysis for Design Parameters of Large Diameter Bored Piles Advanced Materials Research 671-674: 186-189
Durrwang, R.; Ridder, K.H. 1986: Zur Gründung von Talbrücken der Deutschen Bundesbahn auf Grossbohrpfählen - Fondations sur pieux forés de large diamètre pour les ponts sur vallées de la société fédérale des chemins de fer allemands - Large-diameter bored pile foundations for valley bridges of the Deutsche Bundesbahn (German Federal Railways) Bautechnik (Berlin, 1984) 63(4): 126-133
Ding, D.Y.; Yang, X.R.; Lu, W.D.; Liu, W.N.; Yan, M.; Li, A.M. 2011: Numerical Analysis of Metro Station Construction by Large-Diameter Shield and Pile-Beam-Arch Method Advanced Materials Research 368-373: 2711-2715
Naithani, S.K. 1983: Prediction of load bearing capacity of a bored pile during its construction Indian Geotechnical Journal 13(2): 93-102