EurekaMag.com logo
+ Site Statistics
References:
54,215,046
Abstracts:
30,230,908
PMIDs:
28,215,208
+ Search Articles
+ Subscribe to Site Feeds
EurekaMag Most Shared ContentMost Shared
EurekaMag PDF Full Text ContentPDF Full Text
+ PDF Full Text
Request PDF Full TextRequest PDF Full Text
+ Follow Us
Follow on FacebookFollow on Facebook
Follow on TwitterFollow on Twitter
Follow on LinkedInFollow on LinkedIn

+ Translate

Sub-level caving simulation of 3000 pillar-recovery operation at Mount Isa mine, Australia



Sub-level caving simulation of 3000 pillar-recovery operation at Mount Isa mine, Australia



Transactions of the Institution of Mining and Metallurgy Section A, Mining Technology



Simulation shows agreement with actual operations and offers opportunity for optimization.

(PDF emailed within 1 workday: $29.90)

Accession: 023706521

Download citation: RISBibTeXText



Related references

Extraction of 5 Orebody crown pillar at the Isa Lead Mine, Mount Isa Mines Limited, Mount Isa, Queensland, Australia. Publication Series - Australasian Institute of Mining and Metallurgy 5/2002: 191-195, 2002

Numerical simulation of bord and pillar workings of Churcha West Mine, SECL to study the caving behaviour of its massive sandstone roof. Journal of Mines, Metals and Fuels 53(7-8): 117-121, 2005

Development of a pillar extraction strategy for 1100 Orebody, Isa Mine, Mount Isa, Australia. Commonwealth Mining and Metallurgical Congress, Proceedings, 1978

Pillar stability analysis and establishment of a caving sequence, Linea 16-17, II Panel, Rio Blanco Mine, Division Andina. Minerales 49(206): 5-16, 1994

Integration of assay and cross-hole tomographic data in orebody modelling; joint geostatistical simulation and application at Mount Isa Mine, Australia. International Mining and Minerals 41: 18, 2001

Monitoring of stress, strain and displacement in and around a vertical pillar at Mount Isa Mine. Pages 44-49 1976, 1976

Grade control at a multi-source operation; Mount Isa lead mine, Mount Isa. Publication Series - Australasian Institute of Mining and Metallurgy 8/2002: 63-70, 2002

Microseismic monitoring of longwall caving processes at Gordonstone mine, Australia. Pages 67-79 1998, 1998

Laboratory simulation of mine pillar behavior. Proceedings - Symposium on Rock Mechanics 14: 107-119, 1973

Caving process simulation and optimal mining sequence at Tong Kuang Yu Mine, China. Application of Computers and Operations Research in the Mineral Industry Pages 386-392, 1989

Pillar recovery at the Buick Mine. Pages 131-138 1986, 1986

Sill pillar recovery at the Louvicourt Mine. CIM Bulletin Technical Papers 9/2004-1/2006(Pages 203-206, 2006

Long-term subsidence characteristics due to mine development and pillar extraction at a shallow partial extraction room-and-pillar mine in central Illinois. Illinois Mine Subsidence Research Program Pages 19-31, 1996

Digital simulation model of sub-level caving. Conference Series - Australasian Institute of Mining and Metallurgy 3: 211-225, 1974

Developing Australia's first block caving operation at Northparkes Mines - Endeavour 26 deposit. Publication Series - Australasian Institute of Mining and Metallurgy 7/95: 155-164, 1995