+ Site Statistics
+ Search Articles
+ PDF Full Text Service
How our service works
Request PDF Full Text
+ Follow Us
Follow on Facebook
Follow on Twitter
Follow on LinkedIn
+ Subscribe to Site Feeds
Most Shared
PDF Full Text
+ Translate
+ Recently Requested

Railway embankment failure due to ballast layer breach caused by inundation flows



Railway embankment failure due to ballast layer breach caused by inundation flows



Natural Hazards 87(2): 717-738




Please choose payment method:






(PDF emailed within 0-6 h: $19.90)

Accession: 065040402

Download citation: RISBibTeXText

DOI: 10.1007/s11069-017-2789-3


Related references

Analysis of hydraulic and geomorphic conditions causing railway embankment breach due to inundation flow. Journal of Hydroscience and Hydraulic Engineering 30.1, 2012

Evaluation of fractured rock layer heights in ballast railway embankment based on cooling effect of natural convection in cold regions. Cold Regions Science and Technology 42(2): 120-144, 2005

Convective heat transfer in railway embankment ballast. Proceedings of the, 2000

Study on the long-term effects of ballast embankment of the Qinghai-Tibet Railway, China. Bingchuan Dongtu = Journal of Glaciology and Geocryology 26(1): 101-105, 2004

Embankment breach process caused by piping. Kyoto Daigaku Bosai Kenkyujo Nenpo = Disaster Prevention Research Institute Annuals 31B-2: 525-546, 1988

Model testing of two-layer railway track ballast. Journal of Geotechnical and Geoenvironmental Engineering 126(4): 317-323, 2000

Two layer ballast beds as railway track foundations. Proceedings of the, 1999

Failure of railway embankment. International Conference on Case Histories in Geotechnical Engineering 2, Vol, 1988

Variations of active layer thickness beneath embankment along the Qinghai-Tibet Railway. International Conference on Permafrost (ICOP) Proceedings 10, 4: 652-653, 2012

Numerical analysis for the ventilated embankment with thermal insulation layer in Qing-Tibetan Railway. Cold Regions Science and Technology 42(3): 177-184, 2005

On a damage to a railway embankment caused by the muskrat ondatra zibethica. Anzeiger fuer Schaedlingskunde Pflanzenschutz Umweltschutz 59(6): 118-119, 1986

Study on design optimization of a crushed stone layer with shading board placed on a railway embankment on warm permafrost. Cold Regions Science and Technology 54.1, 2008

Using PTV through an embankment breach channel. Journal of Hydro-environment Research 5.4, 2011

Embankment dam breach parameters and their uncertainties. Journal Of Hydraulic Engineering4: 12, 1708-1721, 2008

Uncertainty of predictions of embankment dam breach parameters. Journal of Hydraulic Engineering 130(5): 389-397, 2004