Managed-Pressure-Drilling Equipment Augments Deepwater Well Control
Carpenter, C.
Journal of Petroleum Technology 71(1): 72-74
2019
ISSN/ISBN: 0149-2136
DOI: 10.2118/0119-0072-jpt
Accession: 068029273
PDF emailed within 0-6 h: $19.90
Related References
Denney, D 2012: Managed-Pressure Drilling: Beyond the Conventional Limit in a Deepwater HP/HT Well Journal of Petroleum Technology 64(4): 121-124Montgomery Michael, E.; Leach Colin, P. 1999: Drilling well control practices and equipment considerations for deepwater operations plans Proceedings - Offshore Technology Conference 31
Huey, D.P.; Storms, M.A. 1995: Deepwater drilling tools-1: Novel drilling equipment allows downhole flexibility Oil and Gas Journal 93(3): 63-70
Bybee, K 2010: Managed-Pressure Drilling: Kick Detection and Well Control Journal of Petroleum Technology 62(1): 57-58
Wilson, A 2018: Use of Managed-Pressure Drilling Requires Adjustments To Bridge Gap to Well Control Journal of Petroleum Technology 70(1): 59-60
Nandan, A.; Imtiaz, S. 2017: Nonlinear model predictive control of managed pressure drilling Isa Transactions 69: 307-314
Denney, D. 2013: Dynamic Well-Control Response to Gas Influx in Managed-Pressure Drilling Journal of Petroleum Technology 65(1): 111-114
Hannegan, D.M.; Bourgoyne, A.T. 2001: Deepwater drilling with lightweight fluids : essential equipment required World Oil 222(3): 35-41
Asgharzadeh Shishavan, R; Hubbell, C; Perez, H D.; Hedengren, J D.; Pixton, D S.; Pink, A P. 2016: Multivariate Control for Managed-Pressure-Drilling Systems by Use of High-Speed Telemetry Spe Journal 21(02): 459-470
Carpenter, C 2016: Managed-Pressure-Drilling Technology Delivers Challenging HP/HT Drilling Campaign Journal of Petroleum Technology 68(4): 77-79
Shen Chen; Niu Xinming; Nas Steve; Holt Calvin, S. 2007: Sinopec MPD; 1, Managed-pressure drilling reduces China hard-rock drilling by half Oil and Gas Journal 105(14): 39-45
Demirdal, B.; Cunha, J.C. 2009: Importance of Drilling Fluids' Rheological and Volumetric Characterization to Plan and Optimize Managed Pressure Drilling Operations Journal of Canadian Petroleum Technology 48(02): 8-14
Wilson, A. 2018: Managed-Pressure Cementing: Successful Deepwater Application Journal of Petroleum Technology 70(5): 81-83
JPT staff, _ 1997: Hydrate Control in Deepwater Drilling Journal of Petroleum Technology 49(9): 966-968
Wang, Z. M.; Hao, X. N.; Wang, X. Q.; Xue, L.; Guo, X. L. 2010: Numerical Simulation on Deepwater Drilling Wellbore Temperature and Pressure Distribution Petroleum Science and Technology 28(9): 911-919